User's Cover Picture
User's avatar

Joseph Jackson

Document Controller, Graphics, PowerPoint Presentation, Excel DashBoard, Logo, Flyer & Business Card Designer, Data Entry, Admin/Remote Supp

Message
Intro
Lagos, Nigeria
Senior Project Document Coordinator at Nigeria LNG
Studied • Post Graduate Diploma (PGD) Program - Data Science & Business Analytics (in view), 2021 at University of Texas, United Kingdom
Studied Information / Computer Technology at Federal University of Technology Owerri, Nigeria
Construction
Joined September 6, 2022

Skills

Languages

English
-
Fluent
About
I am a professional with good, traceable and well vested knowledge of Document Controller, Graphics, PowerPoint Presentation, Excel DashBoard, Logo, Flyer & Business Card Designer, Data Entry, Administrative / Remote Support. Over the past years I have work on big project with a lot of data & Metadata generation, inputs and interpreted, analysed to the best of understanding by a layman, e.g. with MS Excel, I can prepare a good and well formatted spreadsheet (with VBA/Macro capabilities), prepare graphical reports, I can design a state-of-the-art Dashboard and I can automate a spreadsheet to be interactive and intuitive with formulas working in the background, the list is endless! Working with Nigeria LNG Limited, I was a professional document coordinator with responsibilities to support project documentation from inception to execution, to As-Built, Handover and Use. Some of sure projects include the Boil off Gas Compressor (BOG), BOG project engages the services of Delattre Bezons Nigeria Limited (DBN) and its ‘numerous subcontractors as Integrator, and Siemens Energy and Schnider Electric as the Original Equipment Manufacturer (OEM). Nitrogen Capacity Enhancement Project engages Dover Engineering Limited as Design Partner, Desicon Engineering Limited as integrator and AirProducts, FSElliots Original Equipment Manufacturer (OEM). The NLNG flagship Project – The Train 7 which is ongoing engages the consortium of Saipem, Chioda and Deawoo (SCD JV) as the main contractor charged with the EPCC responsibilities. In all these projects I interfaced and see to the day-to-day project documentations exchanged to and from company with these contractors / partners, which most of the activities revolved around d the heavy use of MS Excel and Assai as Electronic Document Management System (EDMS). It is worth noting that these project generated hundreds of heavy amount of Metadata traffic, documents, and drawings, calculation notes etc every day. With the above capacities and experiences so far, I am of a sound opinion that I can meet, match, and deliver the Document Controller, Graphics, PowerPoint Presentation, Excel DashBoard, Logo, Flyer & Business Card Designer, Data Entry, Admin/Remote Support project (for your organization) exceptionally with 100% satisfaction, because I use these applications frequently and I know them at my fingertips. I do more with Electronic Document Management System (EDMS), PowerPoint, Graphics, Excel and where necessary I use Pivot and other formulae to deliver the task in a clean well formatted spreadsheet. I am bringing my professional prowess to bear on this project, and I bring verified and traceable experiences to the table all aimed at delivering your project on time, scope and budget., I understand that privacy is business, in all the projects mentioned above, I interface with different and numerous contractors. As a document controller confidentiality is my watchword and keyword (if it does not concern a person, such person need not to know). Your privacy is safe with me. Because we succeed together!
Experience
User avatar
Nigeria LNG
Feb 2014 – Present
Port Harcourt, Nigeria
Senior Project Document Coordinator
Working with Nigeria LNG Limited, I was a professional document coordinator with responsibilities to support project documentation from inception to execution, to As-Built, Handover and Use. Some of sure projects include the Boil off Gas Compressor (BOG), BOG project engages the services of Delattre Bezons Nigeria Limited (DBN) and its ‘numerous subcontractors as Integrator, and Siemens Energy and Schnider Electric as the Original Equipment Manufacturer (OEM). Nitrogen Capacity Enhancement Project engages Dover Engineering Limited as Design Partner, Desicon Engineering Limited as integrator and AirProducts, FSElliots Original Equipment Manufacturer (OEM). The NLNG flagship Project – The Train 7 which is ongoing engages the consortium of Saipem, Chioda and Deawoo (SCD JV) as the main contractor charged with the EPCC responsibilities. In all these projects I interfaced and see to the day-to-day project documentations exchanged to and from company with these contractors / partners.
Education
User avatar
University of Texas, United Kingdom
Jul 2021 – Present
Post Graduate Diploma (PGD) Program - Data Science & Business Analytics, • Post Graduate Diploma (PGD) Program - Data Science & Business Analytics (in view), 2021
User avatar
Federal University of Technology Owerri, Nigeria
Jun 1999 – Oct 2004
B. Engr, Information / Computer Technology